A service by Cactus Consulting (SMC-PVT) Ltd

Central Substation RIBA4 & Build

KBS Maritime Ltd · Portsmouth, South East, England

Closed Construction & Building

Scope of the contract

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

Notice details

Buying organisation KBS Maritime Ltd
Reference 20260225110022-153032
Category Construction & Building
Location Portsmouth, South East, England
Published 25 Feb 2026
Closing date 27 Mar 2026
Similar contracts

More Construction & Building tenders

See all →
Building construction work
The Shrewsbury and Telford Hospital NHS Trust
Closes 21 Aug 2026
Closes 14 Aug 2026
Hospital Refurbishment work and minor new Builds
Maidstone and Tunbridge Wells NHS Trust
Closes 1 Sep 2026