A service by Cactus Consulting (SMC-PVT) Ltd

Noise Barrier Specialist Bolts and Fixings

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 · Birmingham, West Midlands

Closed Construction Materials

Scope of the contract

EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.

EKFB are looking for a competent Supplier to deliver the routewide drainage requirements consisting of plastic drainage both solid and perforated of diameters 150mm to 1200mm circa 143,000 meters, concrete pipes of diameters 150mm to 2,100mm circa 4,300m, catchpits including cover slabs of various diameters 600mm to 3000mm in various depths circa 4,000 instances.

About the buyer's selection process:
Through this expression of interest you vetted in accordance with the EKFB pre-qualification model - for further information visit https://www.competefor.com/EiffageKier/


About the buyer:
EKFB is a joint venture that brings together international, market leading expertise from four leading civil engineering and construction companies: Eiffage, Kier, Ferrovial Construction and BAM Nuttall. All four partners bring specialist expertise in the design, construction, operation, financing and maintenance of railway networks, including some of Europe's largest high speed rail projects.

EKFB is committed to improving lives, communities and the engineering and construction industry by providing sustained employment opportunities and being a good neighbour, protecting the environment and the places we work. Our inclusive culture ensures that our collaborative and innovative solutions provide exceptional value for money.

Notice details

Buying organisation Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Reference C4N109209349
Category Construction Materials
Location Birmingham, West Midlands
Published 18 Mar 2026
Closing date 3 Apr 2026
Similar contracts

More Construction Materials tenders

See all →
Closes 4 Sep 2026
Closes 12 Aug 2026
Closes 24 Aug 2026
Floor Coverings
APUC Limited
Closes 12 Aug 2026
Closes 28 Aug 2026