The framework is advertised on an 8-year open
framework basis, the framework will establish 3
distinct lots, there is no maximum amount of lots a
contractor can bid for, this will include:
Lot 1 – Pitched Roofs
Lot 2 – Flat Roofs
Lot 3 – Solar Installation and Repair